Navien · Boiler troubleshooting

Assembling the foot bar

Ready-Link Commercial

What is going on

Builds each foot bar on the base frame.

Check in this order

  1. Align the bolt holes of the lower fixed brackets (front and back) with the bolt holes of the post bar. Place the back bracket on the side near the M10 bolt holes.
  2. Affix the front and back lower brackets to the post bar with 5 M10 bolts (4 in).
  3. Repeat for the second foot bar.
  4. Affix the front lower bracket to the base frame with 6 tapping screws.
  5. Affix the back lower bracket to the base frame with 3 M10 bolts (3 in).
  6. Repeat the last two steps for the other foot bar.

Applies to: Ready-Link Commercial rack, foot bar

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Ready-Link Commercial Rack System installation guide, p. 2. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.