Zone valve zoning for high-flow or high-head-loss DHW circuits
What is going on
Use this layout when the DHW circuit needs more flow than the boiler allows, or when a coil-type DHW tank has high pressure drop. DHW flows only through the secondary connection piping, and the primary/secondary piping keeps the boiler loop supplied with enough flow.
Check in this order
- Pipe the connection piping (item 23) sized for the total flow it must carry.
- Keep the DHW secondary connector piping no more than eight pipe diameters apart.
- Install a system circulator capable of the required flow and head.
- Install the flow/check valve on the boiler outlet piping to block gravity circulation during DHW heating.
- Follow Figure 14 for the connection layout.
Applies to: SVF 500/600 boilers feeding high-flow or high-head-loss DHW circuits
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF 500/600 Series 1 Boiler Manual, p. 24. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.