Weil-McLain · Boiler troubleshooting
Wall and roof penetration preparation
What is going on
How to cut and seal the openings for the vent and air pipes through the building envelope.
Check in this order
- For a sidewall penetration, cut the hole at least 0.4 in larger than the pipe diameter (7 in hole for 6 in PP or PVC; 9 in hole for 8 in PP or PVC).
- For a roof penetration, cut the hole at least 0.5 in larger than the pipe diameter (7 in hole for 6 in PP or PVC; 9 in hole for 8 in PP or PVC).
- Install a galvanized metal thimble in the pipe hole.
- Use metal cover plates at wall penetrations.
- Seal the annular space around the penetration with approved materials so combustion products cannot enter the building.
- Seal exterior openings thoroughly with exterior caulk.
- Install flashing and sealing boots sized for the vent and air pipes at roof penetrations.
- Follow local codes for isolating vent pipe through floors, walls and roofs.
Applies to: Direct exhaust and direct vent penetrations
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SlimFit series 3 commercial gas-fired water boiler manual, p. 33 and p. 35. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.