Weil-McLain · Boiler troubleshooting
Vertical direct vent termination with sidewall air inlet (Category IV)
What is going on
Vent exits through the roof while the combustion air inlet exits through a sidewall, using a down-turned air elbow and a stop-plate assembly.
Check in this order
- Keep the roof vent termination 12 in min above the roof or snow line and no more than 48 in above the roof.
- Cut the air pipe hole to the air pipe maker's size.
- Cut the vent pipe hole at least 3/8 in larger than the vent pipe diameter for combustible construction, or per the vent maker for noncombustible construction.
- Set a corrosion-resistant metal thimble in the vent hole and follow local code for isolating the pipe through floors, ceilings and roofs.
- Install corrosion-resistant stop plates from the vent pipe maker, with hole sizes just larger than the pipe, so the pipes cannot be pushed inward.
- Insert the last lengths of vent and air pipe from outside until the female-end shoulders rest on the outer stop plates.
- Attach the termination elbow to the air pipe end and fit a bird screen supplied by the vent maker in the open end of the termination.
- Brace the air pipe at no more than 24 in spacing and make sure the air pipe extends far enough through the wall for full engagement of the air elbow.
- Seal all exterior openings with exterior caulk.
- For multiple boilers, keep flue vents 6 in apart from other flue vents, air terminations 6 in apart from other air terminations, and flue vents 12 in horizontally from air terminations.
Applies to: SVF 500/600 Series 1 vertical direct vent with sidewall air
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF 500/600 Series 1 Boiler Manual, p. 48. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.