Vent pipe assembly and cementing for PVC/CPVC

SlimFit Series 3

What is going on

Dry fit the entire run before cementing. Deburr and chamfer pipe ends, clean and dry the surfaces, then prime and cement each joint. Twist the pipe 1/4 turn when inserting. Slope the piping toward the boiler at least 1/4 in per foot with no sags. Keep 3/16 in clearance from combustible material.

Check in this order

  1. Dry fit the whole vent or air run before cementing any joint.
  2. Cut pipe to length, deburr and chamfer both inside and outside of the ends.
  3. Clean and dry all surfaces.
  4. Apply primer to pipe end and fitting socket while wet, then cement in two coats.
  5. Insert the pipe fully while cement is wet, twisting about 1/4 turn.
  6. Wipe excess cement and check for a smooth bead all around.
  7. Slope the run toward the boiler at least 1/4 in per foot with no sags.
  8. Keep at least 3/16 in between vent pipe and combustible material.
  9. Seal wall or floor penetrations per local code.

Applies to: PVC/CPVC direct exhaust vent piping

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit series 3 commercial gas-fired water boiler manual, p. 28. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.