Weil-McLain · Boiler troubleshooting
Vent and air plate - wall hole layout and cutting
What is going on
Lay out and cut the wall holes for the Weil-McLain vent and air plate.
Check in this order
- Place the template from the termination kit on the outside wall at the penetration spot and check for obstructions.
- Level the template. The flue and air pipes must come out side-to-side.
- Mark the four mounting holes, flue pipe and air pipe openings.
- Use a small long bit to drill centering holes first, then drill the large openings from inside and outside.
- Drill the air pipe opening 3-1/2 in diameter for a 3 in air pipe.
- For combustible wall material, drill the vent opening 4 in diameter for a 3 in vent pipe.
- For noncombustible wall material, drill the vent opening 3-1/2 in diameter for a 3 in vent pipe.
- If preferred, run both pipes through one rectangular cutout marked on the template.
- Make sure the outside and inside cover plates are oriented correctly. They are stamped for exhaust (vent) and intake (air).
Applies to: SVF 500/600 Category IV direct vent, sidewall vent and air plate
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain SVF 500/600 Series 1 boiler manual, p. 59. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.