Vent and air plate - wall hole layout and cutting

SVF 500/600 Series 1

What is going on

Lay out and cut the wall holes for the Weil-McLain vent and air plate.

Check in this order

  1. Place the template from the termination kit on the outside wall at the penetration spot and check for obstructions.
  2. Level the template. The flue and air pipes must come out side-to-side.
  3. Mark the four mounting holes, flue pipe and air pipe openings.
  4. Use a small long bit to drill centering holes first, then drill the large openings from inside and outside.
  5. Drill the air pipe opening 3-1/2 in diameter for a 3 in air pipe.
  6. For combustible wall material, drill the vent opening 4 in diameter for a 3 in vent pipe.
  7. For noncombustible wall material, drill the vent opening 3-1/2 in diameter for a 3 in vent pipe.
  8. If preferred, run both pipes through one rectangular cutout marked on the template.
  9. Make sure the outside and inside cover plates are oriented correctly. They are stamped for exhaust (vent) and intake (air).

Applies to: SVF 500/600 Category IV direct vent, sidewall vent and air plate

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain SVF 500/600 Series 1 boiler manual, p. 59. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.