Vent and air plate - mounting and sealing
What is going on
Fit, seal and fasten the vent and air termination plate.
Check in this order
- Cut the flue pipe so it extends through the wall and fully enters the termination socket.
- Cut the air pipe so it presses against the stops inside the termination.
- Slide the flue and air pipes through the openings, then slide the inside plate onto the pipes.
- Position the inside plate so the pipes slope down slightly toward the boiler at 1/4 in per foot.
- Mark and drill the four mounting holes, remove the pipes, and mount the inside plate.
- Test fit the vent/air termination on the vent pipe. The vent pipe must fully enter the socket and the air pipe must butt against the interior stops.
- Apply silicone RTV sealant inside the vent termination, slide it onto the vent pipe, and rotate slightly to spread the sealant.
- Fasten the termination with four #10 x 1/2 in sheet metal screws and lock washers.
- Seal exterior openings thoroughly with exterior caulk.
Applies to: SVF 500/600 Category IV direct vent, sidewall vent and air plate
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain SVF 500/600 Series 1 boiler manual, p. 59-60. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.