Weil-McLain · Boiler troubleshooting

Vent and air pipe assembly rules

SlimFit Series 2

What is going on

Assemble vent and air piping so the joints stay sealed and the pipe runs cleanly. Follow the material and adapter rules in the manual.

Check in this order

  1. Install the SlimFit vent/air adapter at the boiler vent and air connections, and add a pipe-maker reducer if the pipe is smaller than the adapter outlet.
  2. Check that the vent-to-adapter gasket is in place with the barbed band pointing down.
  3. Tighten the vent connection clamp securely, but do not over-tighten it or let the band deform or dig into the plastic connector.
  4. Put a locking collar on every vent and air joint.
  5. Permanently join PVC and CPVC joints with the correct primer and cement.
  6. Use sweep elbows where possible, because short-radius elbows cut allowable pipe length.
  7. Install a manufacturer bird screen at each vent and air termination. Buy the screen from the pipe supplier.

Applies to: All SlimFit Series 2 vent and air piping

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit 1000-2000 Series 2 boiler manual, p. 24. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.