Weil-McLain · Boiler troubleshooting

Sidewall vent termination: approved fittings only

CGi Series 5

What is going on

Sidewall vents may only end with the terminations shown in Figure 14. Other terminations can cause nuisance shutdowns and loss of heat.

Likely causes

  • Non-approved termination fitting
  • Termination fitting that does not match the vent system

Check in this order

  1. Use an elbow or vertical tee with screen(s), or an elbow with a termination coupling and screen.
  2. Match the termination to the vent system type (Saf-T Vent, Z-Vent, FasNSeal or CORR/GUARD) as shown in Figure 14.
  3. Do not use any other termination type.

Applies to: CGi-25 to CGi-8

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CGi Series 5 boiler manual, p. 25-26. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.