Sidewall separate pipes: termination installation

SVF 500/600 Series 1

What is going on

Mounting the vent and air pipes through a sidewall with stop plates and termination elbows.

Check in this order

  1. Cut a hole for the air pipe per the air pipe maker's size.
  2. Cut the vent hole at least 3/8 in larger than the pipe in combustible construction, or per the vent maker in noncombustible construction, and set a corrosion-resistant thimble.
  3. Install corrosion-resistant stop plates from the vent maker, with holes just larger than the vent pipe.
  4. Insert vent and air pipe from outside until female-end shoulders rest against the outer stop plates.
  5. Attach the exterior pipe and the vent termination elbow (outward facing) and air termination elbow (down-turned).
  6. Fit a bird screen supplied by the installer in the open end of the termination.
  7. Brace individual pipes at up to 24 in spacing and maintain all clearances and lengths.
  8. Seal the exterior openings with exterior caulk.

Applies to: SVF direct vent sidewall separate pipes

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 Boiler Manual, p. 51. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.