Weil-McLain · Boiler troubleshooting
Sidewall direct vent with separate vent and air pipes: termination location
What is going on
Choose a sidewall location that meets clearances and gives clean routing from the boiler vent connection.
Check in this order
- Confirm the termination meets the clearances in the direct vent location table before cutting anything.
- Keep the termination at least 12 in above grade and snow line, and keep vent and air areas clear of snow.
- Pick a spot where leaves, debris and sediment are unlikely to build up on the termination.
- Plan the boiler location so vent piping can run cleanly from the boiler connection to the sidewall termination without exceeding the maximum vent length.
- Consider plume and condensate effects on nearby surfaces and people when selecting the location.
- Keep 4 ft horizontal clearance from electrical and gas meters, regulators and relief equipment, and do not place the termination above or below them.
- For multiple boilers, follow the multiple termination layout and spacing shown for separate pipes.
Applies to: SVF direct vent sidewall separate pipes
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF 500/600 Series 1 Boiler Manual, pp. 49-50. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.