What is going on

Choose a sidewall location that meets clearances and gives clean routing from the boiler vent connection.

Check in this order

  1. Confirm the termination meets the clearances in the direct vent location table before cutting anything.
  2. Keep the termination at least 12 in above grade and snow line, and keep vent and air areas clear of snow.
  3. Pick a spot where leaves, debris and sediment are unlikely to build up on the termination.
  4. Plan the boiler location so vent piping can run cleanly from the boiler connection to the sidewall termination without exceeding the maximum vent length.
  5. Consider plume and condensate effects on nearby surfaces and people when selecting the location.
  6. Keep 4 ft horizontal clearance from electrical and gas meters, regulators and relief equipment, and do not place the termination above or below them.
  7. For multiple boilers, follow the multiple termination layout and spacing shown for separate pipes.

Applies to: SVF direct vent sidewall separate pipes

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 Boiler Manual, pp. 49-50. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.