Sidewall concentric termination installation
What is going on
Mounting the concentric kit through a wall with a rain cap that seats on the wall or thimble plate.
Check in this order
- Locate the concentric termination per the clearance table and the multiple-boiler spacing rules.
- Assemble the termination as described for concentric terminations.
- Use a thimble with a 4-1/2 in hole as the preferred wall penetration.
- If not using a thimble, cut the wall hole with a hole saw no larger than 4-3/4 in diameter, leaving a solid stop for the rain cap ribs.
- Make sure the wall is strong enough that the rain cap cannot be pushed inward from outside.
- Secure the termination so the rain cap ribs rest against the outside wall or outer thimble plate.
- Protect the exposed assembly with plastic during insertion through the wall penetration.
- Install the vent and air piping from the boiler to the concentric termination after the termination is mounted and secured.
- Support the vent and air pipes every 5 ft, and brace the wall with a wall brace per the installer or vent maker instructions.
Applies to: SVF direct vent sidewall concentric (Category IV)
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF 500/600 Series 1 Boiler Manual, pp. 55-56. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.