Weil-McLain · Boiler troubleshooting

Shut down boiler before cleaning the heat exchanger (pin side)

SlimFit Series 3

What is going on

Prepare the boiler before opening the heat exchanger for cleaning.

Check in this order

  1. Follow the 'To Turn Off Gas to Appliance' instructions on the boiler and the lighting instructions.
  2. Do not drain the boiler unless it will be exposed to freezing. If freeze prevention fluid is in the system, do not drain.
  3. Let the boiler cool to room temperature if it has been firing.
  4. Turn the two rotary latches on the front door, tilt the top of the door forward, then lift it up.
  5. Use a 13 mm wrench or socket to remove the nuts on the front cover plate and remove the plate.
  6. Use the cleanout plug in the flue pipe to rinse debris into the condensate drain. Flush the condensate drain, then refill it.
  7. Follow the heat exchanger access and cleaning procedure.

Applies to: SlimFit SF-550 and SF-750 Series 3

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit series3 commercial gas-fired water boiler boiler manual, p. 105. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.