What is going on

Line voltage routing into the control tray.

Check in this order

  1. Run line voltage from the left side entrances into the control tray.
  2. Strip wire ends no more than 1/4 in. to avoid exposed conductor.
  3. Install an On/Off service switch in a junction box near the boiler per code.

Applies to: Line voltage field wiring

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 Boiler Manual, p. 66. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.