Route and terminate low voltage wiring

SVF 500/600 Series 1

What is going on

Low voltage wiring and cabinet routing steps.

Check in this order

  1. Mount the low voltage wire grommets in the chosen knockouts.
  2. Run thermostat, aquastat, limit, sensor, 0-10 Vdc and outdoor sensor wire pairs through the grommets.
  3. Connect each wire directly to its terminal block on the control board.
  4. Bundle wires with the supplied ties, loop through the tie mount and secure to the bottom right control bracket hole.
  5. Confirm all wires are sealed at the cabinet entrances after terminating.

Applies to: Low voltage field wiring

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 Boiler Manual, p. 66. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.