Weil-McLain · Boiler troubleshooting

Reinstall cleanout plate and burner assembly

SlimFit Series 2

What is going on

Reinstall the cleanout plate with a new silicone cord gasket and torque the nuts correctly.

Check in this order

  1. Replace the red silicone cord gasket with a new one from the annual maintenance kit or cover plate kit; remove old silicone first.
  2. Seat the gasket in the groove starting at the upper corners, leaving slight slack, then the lower corners.
  3. Re-install the original cleanout plate gasket after inspection.
  4. Position the cleanout plate and install nuts in the staggered pattern.
  5. Tighten to 18 N-m / 160 in-lbs / 13 ft-lbs in top-to-bottom center-out sequence (Figure 95, page 104).
  6. Reinstall the burner, combustion chamber access plate, and blower/venturi/mixing tube assembly (see page 91).
  7. Reconnect wiring, including the igniter ground wire to the top igniter mounting screw.

Applies to: SlimFit 1000-2000 Series 2

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain SlimFit Series 2 boiler manual, p. 103-104. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.