What is going on

Use CPVC for the first 10 linear ft of exhaust piping. PVC may only be used after the first 10 linear ft of CPVC. All fittings within the first 10 ft must be CPVC. Using PVC in the first 10 ft can cause severe injury, death or property damage.

Check in this order

  1. Install at least 10 linear ft of CPVC pipe at the boiler exhaust, with CPVC fittings.
  2. Install PVC only after the 10 ft CPVC section.
  3. Use the correct PVC/CPVC adapter where the piping does not connect directly to the vent connection adapter (Figure 20 and Table 8).

Applies to: SVF 500/600 exhaust piping using PVC or CPVC

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 Boiler Manual, p. 31. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.