Weil-McLain · Boiler troubleshooting

Place boiler and set level

SlimFit Series 3 Commercial

What is going on

Cold storage below 0°F can make plastic parts brittle, so handle the boiler carefully until it reaches room temperature.

Check in this order

  1. Leave the boiler on the crate base until it is in its final location.
  2. Cut the retaining straps and remove the outer carton.
  3. Leave the plastic cover on the vent outlet until vent piping is attached.
  4. Lift the boiler from the skid by its jacket or base, never by the water or gas pipes.
  5. Inspect the base for cracks or damage. It must be sound and sealed for proper operation.
  6. Set the boiler and check level, using shims if needed (also level the condensate pump if used).

Applies to: All SlimFit boilers

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit 550/750 Series 3 boiler manual, p. 8. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.