Weil-McLain · Boiler troubleshooting
Place boiler and set level
What is going on
Cold storage below 0°F can make plastic parts brittle, so handle the boiler carefully until it reaches room temperature.
Check in this order
- Leave the boiler on the crate base until it is in its final location.
- Cut the retaining straps and remove the outer carton.
- Leave the plastic cover on the vent outlet until vent piping is attached.
- Lift the boiler from the skid by its jacket or base, never by the water or gas pipes.
- Inspect the base for cracks or damage. It must be sound and sealed for proper operation.
- Set the boiler and check level, using shims if needed (also level the condensate pump if used).
Applies to: All SlimFit boilers
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SlimFit 550/750 Series 3 boiler manual, p. 8. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.