Multiple zones with circulators

CGi Series 5

What is going on

Size each circulator for its own circuit. Do not put a circulator on the boiler except in primary/secondary piping. Balance the zones with isolation valves. Each zone circulator needs its own relay.

Check in this order

  1. Size each zone circulator for its individual circuit.
  2. Do not install a circulator on the boiler unless it is primary/secondary piping.
  3. Install isolation (balancing) valves so heat reaches all zones.
  4. Install and wire a separate relay for each zone circulator.
  5. Keep return water at or above 130°F (Figure 17).

Applies to: CGi-25 to CGi-8

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CGi Series 5 boiler manual, p. 30. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.