Weil-McLain · Boiler troubleshooting

Multiple boiler terminations and vent/air clearances

SlimFit Series 3

What is going on

Spacing rules when more than one SlimFit boiler terminates on the same wall or roof.

Likely causes

  • Vent outlets and air inlets at different heights
  • Vent pipe of one boiler too close to the air inlet of the next

Check in this order

  1. Terminate every vent/air connection as described in this manual for individual vents.
  2. Set all vent pipes and air inlets at the same height.
  3. Place wall penetrations for at least 12 in between a vent pipe and the adjacent air inlet elbow (US installations).
  4. For Canadian installations, follow the clearances in CSA B149.1 or B149.2.
  5. Treat the direct vent air inlet as part of a direct vent connection, not as a forced air intake for spacing from adjacent vents.
  6. Space terminations for good installation practice and required maintenance access.

Applies to: SF-550 and SF-750 with multiple boilers

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit series 3 commercial gas-fired water boiler manual, p. 33 and p. 40. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.