Weil-McLain · Boiler troubleshooting

Multiple boiler direct exhaust sidewall terminations

SVF 500/600 Series 1

What is going on

Terminate each boiler's vent on the wall with the same clearances as a single boiler, following the typical layout.

Check in this order

  1. Place each wall penetration to meet the minimum U.S. clearances in Figure 28, p. 44.
  2. For Canadian installs, meet the clearances in CAN/CSA B149.1 and use a ULC S636-compliant vent kit.
  3. Keep all vent terminations at the same height and at least 12 in above grade or snow line.
  4. Follow the multiple-boiler layout in Figure 29, p. 45.

Applies to: Multiple SVF boilers, direct exhaust sidewall

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 Boiler Manual, p. 44. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.