Massachusetts side wall vent requirements

CGi Series 5

What is going on

Applies to side wall horizontally vented gas equipment in residential buildings where the exhaust termination is under 7 ft above finished grade.

Check in this order

  1. Confirm a hard wired CO detector with alarm and battery backup is installed on the level where the boiler is installed.
  2. Confirm a battery or hard wired CO detector with alarm is on each additional level served.
  3. If installed in a crawl space or attic, the hard wired detector may go on the next adjacent floor.
  4. If the requirements cannot be met at completion, the owner has 30 days to comply. Install a battery CO detector in the meantime.
  5. Use detectors that meet NFPA 720 and are ANSI/UL 2034 listed and IAS certified.
  6. Mount a metal or plastic sign on the exterior at least 8 ft above grade, in line with the vent terminal. Lettering must be at least 1/2 inch and read GAS VENT DIRECTLY BELOW, KEEP CLEAR OF ALL OBSTRUCTIONS.
  7. Leave a copy of all venting and installation instructions with the appliance.

Applies to: CGi-25 to CGi-8

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CGi Series 5 Gas-Fired Water Boiler boiler manual, p. 21. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.