Weil-McLain · Boiler troubleshooting
Massachusetts side wall vent requirements
What is going on
Applies to side wall horizontally vented gas equipment in residential buildings where the exhaust termination is under 7 ft above finished grade.
Check in this order
- Confirm a hard wired CO detector with alarm and battery backup is installed on the level where the boiler is installed.
- Confirm a battery or hard wired CO detector with alarm is on each additional level served.
- If installed in a crawl space or attic, the hard wired detector may go on the next adjacent floor.
- If the requirements cannot be met at completion, the owner has 30 days to comply. Install a battery CO detector in the meantime.
- Use detectors that meet NFPA 720 and are ANSI/UL 2034 listed and IAS certified.
- Mount a metal or plastic sign on the exterior at least 8 ft above grade, in line with the vent terminal. Lettering must be at least 1/2 inch and read GAS VENT DIRECTLY BELOW, KEEP CLEAR OF ALL OBSTRUCTIONS.
- Leave a copy of all venting and installation instructions with the appliance.
Applies to: CGi-25 to CGi-8
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: CGi Series 5 Gas-Fired Water Boiler boiler manual, p. 21. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.