What is going on

The SF-750 natural gas unit has no blower plate. The propane version needs the plate and gaskets shipped with the boiler.

Check in this order

  1. Turn off all power to the boiler.
  2. Disconnect the two wiring connectors on the blower.
  3. Disconnect the blower flange from the mixing tube flange and support the blower and gas train.
  4. Check that the plate reads "750 LP".
  5. Fit one gasket on each side of the blower plate, then position the blower.
  6. Start the nuts on the top two bolts, then the bottom two, without tearing the gasket.
  7. Torque the flange bolts to 15 N-m / 132 in-lbs / 11 ft-lbs, without over-tightening.
  8. Reconnect the two blower harnesses and reinstall the front door.
  9. Restore power, open the manual gas valve, check for leaks, then adjust combustion and run startup.

Applies to: SF-750 propane only

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit 550/750 Series 3 boiler manual, p. 9. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.