Weil-McLain · Boiler troubleshooting
Install direct vent vertical terminations
What is going on
Vertical vent and air terminations need flashing and sealing boots sized for the pipe. Terminations use a coupling or open-end pipe per vent maker guidelines. Maintain the finished termination dimensions in the manual's figure. Vertical vent with sidewall air uses stop plates at the wall and a down-turned air elbow.
Check in this order
- Cut the air pipe hole sized per the vent/air maker's instructions.
- Cut the vent pipe hole and size it as for sidewall venting; insert a corrosion-resistant thimble.
- Install flashing and sealing boots sized for the vent pipe.
- Terminate vertically with a coupling or open-end pipe per vent maker guidance and add bird screens in open ends.
- Maintain the finished termination dimensions shown in the manual.
- For sidewall air with vertical vent, fit stop plates, insert the air pipe until the shoulder seats, install the down-turned air elbow and a bird screen, then seal with exterior caulk.
Applies to: SlimFit boilers in vertical direct vent configuration
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Weil-McLain SlimFit Series 2 boiler manual, p. 41, p. 42, p. 43. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.