Weil-McLain · Boiler troubleshooting
Inspect and reinstall heat exchanger cover plate
What is going on
Check the cover plate gasket and insulation, then tighten the cover plate in the correct pattern.
Check in this order
- Inspect the silicone cord cover plate gasket and replace it if damaged.
- Make sure the gasket sits in the heat exchanger groove.
- Inspect the cover plate insulation and replace it if damaged.
- Reinstall the cover plate in the sequence shown for the boiler model (SF-550 or SF-750 figure).
- Tighten the hex nuts in the staggered pattern, repeating until the torque is reached.
- Reinstall the burner, mixing tube and blower assembly, then reconnect the wiring including the ignitor ground wire to the top ignitor mounting screw.
- Restore gas supply and power, start the boiler and verify operation.
Applies to: SlimFit SF-550 and SF-750 Series 3
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SlimFit series3 commercial gas-fired water boiler boiler manual, p. 106. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.