Test the boiler water side before water, gas or electrical hookup. Test pressure limits depend on the relief valve rating.
Check in this order
- Remove the shipping nipple from the supply tapping and remove the relief valve. Plug the relief tapping with a 3/4 inch NPT plug.
- Install the drain valve and pressure/temperature gauge on the return and supply connections, plus the circulator hardware.
- Connect a hose from the boiler drain valve to a fresh water supply.
- Install shutoff valves with nipples on the system supply and return to bleed air during fill.
- Open the shutoff valves, then slowly open the drain valve and fill the boiler with water.
- When water flows from the shutoff valves, close the drain valve and then close the shutoff valves.
- Slowly raise pressure to the limit in the pressure table, and hold for no more than 10 minutes.
- Keep constant pressure during the test and check all joints for leaks. Repair any leak right away.
- Disconnect the fill hose, drain the boiler, remove test nipples and valves not used in the system, and reinstall the relief valve.
Applies to: CGi-25 to CGi-8
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: CGi Series 5 Gas-Fired Water Boiler boiler manual, p. 17. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.