Weil-McLain · Boiler troubleshooting

General field wiring rules

SlimFit Series 3

What is going on

Electrical connections for the SlimFit control. Work must meet the National Electrical Code and local rules.

Check in this order

  1. Turn off power at the service entrance panel before making any connection.
  2. Use N.E.C. Class 1 wiring. If original factory wiring is replaced, use 105 °C wire or equivalent.
  3. Ground the boiler as required by NEC ANSI/NFPA 70.
  4. Do not use the 24 V transformer output to power any device not listed in this manual.
  5. Use a strain relief at every jacket knockout. Eight knockouts are in the top of the cabinet for line and low voltage wiring.

Applies to: SlimFit 550/750 Series 3 boiler

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit Series 3 boiler manual, p. 50. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.