Direct vent sidewall termination with separate air and vent pipes
What is going on
Termination layout when combustion air and flue are run as separate pipes through the wall.
Likely causes
- Vent elbow turned sideways, causing ice buildup on the building side
- Air inlet and vent terminations at different heights
Check in this order
- Set the vent and air terminations as in the left-side configuration unless clearance to grade or snow line cannot be met.
- Use the right-side configuration (raised terminations) when extra clearance to grade or snow line is needed.
- Make the elbow at the exit opening butt against the outside wall plate.
- Point the vent elbow outward or away from the air inlet.
- If external pipe is up to 4 ft each for vent and air, brace it no more than 24 in apart.
- If external vent or air pipe is longer than 4 ft each, insulate the enclosure and exit the terminations through it.
- If pipes extend beyond the wall, install a coupling at the exit opening butted to the outside plate, then continue piping from the coupling.
- Keep the air and vent piping within the maximum length in the sidewall piping table, observing the elbow reduction rule.
Applies to: SF-550 and SF-750 direct vent, sidewall with separate pipes
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SlimFit series 3 commercial gas-fired water boiler manual, p. 39. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.