Weil-McLain · Boiler troubleshooting

Direct exhaust vertical termination location

SVF 500/600 Series 1

What is going on

Place the vertical vent termination where it will not be damaged by debris, leaves or sediment, and where snow will not block it.

Check in this order

  1. Keep the termination 12 in minimum above the roof or snow line and no more than 48 in above the roof.
  2. Add a bird screen to the inlet adapter to keep debris out of the boiler cabinet.
  3. Route the vent from the boiler so total exposed length stays within the Category IV maximum in the venting table (Figure 22, p. 36).
  4. For multiple boilers, space each vent termination per the clearance figure (Figure 26).

Applies to: Direct exhaust vertical termination, Cat. II and IV

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 Boiler Manual, p. 41. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.