Locate the vent termination so every clearance is met. Site conditions may require more clearance.

Check in this order

  1. Keep the termination at least 4 ft horizontally from electric meters, gas meters, regulators and relief equipment. Never place it above or below these.
  2. Place the termination more than 4 ft below or to the side of any door or window.
  3. Keep it more than 1 ft above grade or the expected snow line.
  4. Keep it at least 7 ft above a public walkway.
  5. Keep it 3 ft above any forced air intake within 10 ft.
  6. Keep it at least 6 ft from adjacent walls and no closer than 5 ft below a roof overhang.
  7. Keep it well away from trees, shrubs and decorative items.
  8. Do not terminate in a window well, stairwell, alcove, courtyard or other recessed area.
  9. Do not terminate above any door or window.
  10. Do not connect another appliance or multiple boilers to the vent pipe.
  11. Do not wrap or insulate the vent pipe or fittings.
  12. Do not extend exposed vent pipe more than 4 ft outside the building.
  13. Locate or guard the termination to prevent condensate damage and accidental contact.
  14. Do not run the vent through an exterior wall adjacent to eaves, parapets, balconies or decks.

Applies to: CGi-25 to CGi-8

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CGi Series 5 Gas-Fired Water Boiler boiler manual, p. 23-24. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.