Weil-McLain · Boiler troubleshooting

Direct exhaust vent pipe general rules

SlimFit Series 3

What is going on

Use a 6 in or 8 in vent pipe. Direct exhaust has no minimum vent length. Use one material type throughout and do not join different piping types. Vent must terminate through the roof or, for sidewall, through the wall only using the methods in the manual. Install a bird screen at each termination.

Check in this order

  1. Select 6 in or 8 in pipe.
  2. Use only approved vent and air materials listed in the manual.
  3. Do not mix pipe materials in one run.
  4. Install a bird screen at each vent termination. Manual notes conflict on whether screens are supplied; confirm before ordering.
  5. Inspect all joints so they are watertight and meet code.

Applies to: Direct exhaust (Category II) installations

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit series 3 commercial gas-fired water boiler manual, p. 25. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.