Direct exhaust vent installation rules
What is going on
General install rules for direct exhaust venting: no mixed vent materials, sealed joints, correct slope, clearances to combustibles, and approved penetrations.
Check in this order
- Do not mix vent types or manufacturers.
- Clean all joints and seal them with the vent maker's sealant. Do not use screws.
- Install the vent with seams on top of horizontal runs.
- Keep at least 2 inches from combustible material to the vent pipe.
- For vertical venting, pass the pipe through the roof flashing, jacket or thimble as the vent maker directs.
- For sidewall venting, end the vent at least one foot above the expected snow line.
- Install the horizontal drain tee as close to the boiler as possible, in the first horizontal run.
- Do not exceed the maximum vent length in Table 6 on page 20.
- Do not seal the slip connector to the inside or outside wall plate.
- Where the vent passes through a noncombustible wall, make the hole large enough for the pipe or slip connector.
Applies to: CGi-25 to CGi-8
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: CGi Series 5 boiler manual, p. 25. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.