Weil-McLain · Boiler troubleshooting

Direct exhaust sidewall termination steps

SlimFit Series 3

What is going on

Use a coupling that butts against the outside wall plate. Choose the left-side configuration unless it fails minimum clearance to grade or snow line, then use the raised right-side (snorkel) configuration. Do not terminate next to the wall, under eaves, parapets, balconies or decks.

Check in this order

  1. Set the termination coupling against the outside wall plate.
  2. If clearance to grade or snow line fails, use the raised snorkel configuration with an elbow.
  3. Prepare wall penetrations before installing vent piping.
  4. Attach external pipe and fittings per termination instructions.
  5. Support vertical runs on the outside with brackets.
  6. Install vent piping from boiler to termination, with hanger support within 6 in of any upturn.
  7. Connect vent piping at the boiler per manual instructions.

Applies to: Sidewall direct exhaust

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SlimFit series 3 commercial gas-fired water boiler manual, p. 31, 32. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.