Connect and leak-test the gas supply piping
What is going on
Gas connection work on the 550/750 SlimFit. Support the piping with hangers so the boiler is not carrying the load, and use two wrenches so the boiler gas connection does not turn.
Check in this order
- Remove the jacket front panel to reach the gas connection.
- Install a union for service, and a manual shutoff valve in the supply piping within 6 feet of the boiler.
- In Canada, make sure the installer identifies the manual gas valve.
- Purge all air from the gas supply piping.
- Leak-check the boiler and its gas connection before firing. Use a soapy water bubble test only, never an open flame.
- For pressure tests at or below 20 in. w.c., close the manual main shutoff valve.
- For pressure tests above 20 in. w.c., disconnect the boiler gas connection from the supply piping.
- Use pipe dope rated for propane, applied lightly to male threads only so it does not block gas flow.
Applies to: SlimFit 550/750 Series 3 boiler
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SlimFit Series 3 boiler manual, p. 48. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.