Weil-McLain · Boiler troubleshooting

Concentric termination assembly

SVF 500/600 Series 1

What is going on

Assembling the inner and outer pipe termination kit before installation.

Check in this order

  1. Keep the rain cap and bird screen off until the assembly is through the roof or wall and all supports are in place.
  2. Cover the end of the assembly with plastic before inserting it through the penetration.
  3. Cut the bird screen to fit the outside diameter of the inner PVC pipe if trimming is needed.
  4. Partially assemble the termination in the order shown in the kit drawing or the kit instructions.
  5. Shorten the inner and outer pipes only if needed, and make sure they still connect correctly at both ends.
  6. Do not alter the concentric assembly. If it must be removed and cleaned, replace it instead.
  7. Make sure the concentric termination is assembled correctly to prevent flue gas recirculation.

Applies to: SVF concentric termination kit (vertical and sidewall)

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 Boiler Manual, p. 54. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.