Weil-McLain · Boiler troubleshooting
Concentric termination assembly
What is going on
Assembling the inner and outer pipe termination kit before installation.
Check in this order
- Keep the rain cap and bird screen off until the assembly is through the roof or wall and all supports are in place.
- Cover the end of the assembly with plastic before inserting it through the penetration.
- Cut the bird screen to fit the outside diameter of the inner PVC pipe if trimming is needed.
- Partially assemble the termination in the order shown in the kit drawing or the kit instructions.
- Shorten the inner and outer pipes only if needed, and make sure they still connect correctly at both ends.
- Do not alter the concentric assembly. If it must be removed and cleaned, replace it instead.
- Make sure the concentric termination is assembled correctly to prevent flue gas recirculation.
Applies to: SVF concentric termination kit (vertical and sidewall)
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SVF 500/600 Series 1 Boiler Manual, p. 54. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.