Weil-McLain · Boiler troubleshooting

Combustion air manifold (Category IV, direct vent only)

SVF 500/600 Series 1

What is going on

Several Category IV SVF boilers can share one combustion air duct. Only the air inlet piping may be combined. Vent piping must never be combined.

Check in this order

  1. Size the shared air duct at a minimum of 1 sq in of free area per 2,000 Btuh of total connected boiler input, adjusted for louver restriction.
  2. Divide the total input in MBH by 2 to get the minimum free area in square inches (example: 3,000 MBH gives 1,500 sq in).
  3. Keep at least 12 in of clearance from the grade or snow line to the air duct opening.
  4. Keep a minimum of 3 ft below any vent termination within 10 ft horizontally.
  5. Do not combine Category IV vent piping. Flue gas leakage and component damage can result.

Applies to: SVF 500/600 Series 1, Category IV, direct vent manifolded air

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 Boiler Manual, p. 40. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.