Weil-McLain · Boiler troubleshooting

Closed-type expansion tank piping (single zone)

CGi Series 5

What is going on

Size the closed-type tank for the system volume and temperature. Connect it to the ½-inch NPT tapping behind the supply outlet with ½-inch NPT piping. Pitch horizontal piping up toward the tank at 1 inch per 5 feet.

Check in this order

  1. Size the tank for the boiler and system water volume and temperature per the tank maker's instructions.
  2. Connect the tank to the ½-inch NPT tapping behind the supply outlet using ½-inch NPT pipe.
  3. Pitch horizontal piping up toward the tank at 1 inch per 5 feet.

Applies to: CGi-25 to CGi-8

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CGi Series 5 boiler manual, p. 28. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.