Weil-McLain · Boiler troubleshooting

Circulator zoning, primary/secondary

SVF 500/600 Series 1

What is going on

For circulator-zoned systems where the boiler loop is a secondary circuit off a primary system loop. Each zone has its own circulator.

Check in this order

  1. Install a separate circulator for each zone, sized for the required flow and head (Figure 17).
  2. Install the flow/check valve on the boiler outlet piping to prevent gravity circulation during DHW heating.
  3. Keep the primary/secondary tees no more than eight pipe diameters apart.
  4. Install optional DHW piping per Figure 17 if used.

Applies to: SVF 500/600 boilers with circulator zoning

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: SVF 500/600 Series 1 Boiler Manual, p. 26. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.