Weil-McLain · Boiler troubleshooting

Check manifold orifice sizing

CGi Series 5

What is going on

Confirm the burner orifices match the gas type and altitude before firing. The size is stamped on the orifice spud barrel.

Check in this order

  1. Remove the front jacket door.
  2. Remove the burner shield (see parts page 84).
  3. Read the orifice size stamped on the spud barrel and compare it to the orifice sizing table.
  4. Use only correctly sized manifold orifices.
  5. Reinstall the burner shield. Never run the boiler without it.

Applies to: CGi-25 to CGi-8

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CGi Series 5 Gas-Fired Water Boiler boiler manual, p. 16. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.