Bolt the boiler down to mounting blocks (seismic or code requirement)
What is going on
Where the boiler must be anchored, remove the casters and bolt the base to mounting blocks through the existing base holes.
Check in this order
- Remove the casters.
- Bolt the boiler base to mounting blocks using the existing holes in the base.
- Make sure the blocks hold at least 5¼ inches between the base bottom and the floor.
- Verify the final mounting meets seismic, structural and other applicable codes and engineering practice.
Applies to: SlimFit 1000-2000 Series 2 boilers
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: SlimFit Series 2 Boiler Manual, p. 12. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.