Assemble PVC or CPVC vent and air pipe joints

SlimFit Series 3

What is going on

Gluing procedure for plastic vent and air piping on SlimFit boilers. Dry fit everything first.

Check in this order

  1. Dry assemble the full vent or air run and mark each pipe with a felt-tip pen at the full insertion depth.
  2. Cut pipe to length, deburr inside and outside, and chamfer each outside pipe end.
  3. Clean all pipe ends and fittings and dry them thoroughly.
  4. Handle fittings so the joint surfaces stay clean.
  5. Apply primer generously to pipe end and fitting socket while both are wet.
  6. While primer is still damp, apply a thin even coat of approved cement to both surfaces.
  7. Apply a second coat of cement to both surfaces, without flooding the socket.
  8. Push the pipe fully into the fitting with a 1/4 turn while the cement is wet.
  9. Wipe off excess cement and confirm a smooth bead shows all the way around the joint.
  10. Use cement sparingly so it does not block the condensate opening.

Applies to: PP, PVC, CPVC or ABS vent and air piping

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Weil-McLain SlimFit Series 3 boiler manual, p. 45. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.