Weil-McLain · Boiler troubleshooting

Application B3 wiring to boiler and TIU

ECO HP

What is going on

Wiring for the B3 layout. The boiler connects to the 120 Vac input. The TIU main end switch handles heating. Zone circulators and the boiler circulator are wired per the figure. The Priority On dipswitch on the TIU must be OFF for this application. The figure text is partly garbled, so verify on the full drawing.

Check in this order

  1. Connect the 120 Vac input to the boiler.
  2. Wire the 'To Boiler' connection between the heat pump indoor unit and the boiler.
  3. Wire the TIU main end switch for heating.
  4. Wire the zone circulators from the TIU.
  5. Set the TIU Priority On dipswitch to OFF.

Applies to: Application B3 (Multi-zone space heating, boiler only DHW)

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: ECO HP Heat Pump Application Guide, pp. 38-39. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.