Weil-McLain · Boiler troubleshooting
Application B2 thermostat interface unit and U-Control wiring
What is going on
Shows the boiler 120 Vac input, the TIU (SR-503-5) and the U-Control connections for the Primary/Secondary layout. The TIU handles the main heating end switch, the priority DHW end switch and the zone and DHW circulators. The figure text is partly garbled, so verify on the full drawing.
Check in this order
- Connect the boiler 120 Vac input to the boiler as shown.
- Wire the TIU main end switch input for heating.
- Wire the TIU priority end switch input for DHW.
- Wire the zone circulators and the DHW circulator from the TIU outputs as shown.
- Verify the TIU and U-Control terminal labels against the drawing before power-up.
Applies to: Application B2 (System Type B, Primary/Secondary)
More boiler guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: ECO HP Heat Pump Application Guide, p. 33. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.