Glow Brand sequences of operation
6 sequences for Glow Brand equipment: what the unit does, step by step, with the timings. Pick the equipment type, then the mode.
Boiler (6)
Startup
- Power-up and de-air
B85/B120/B160
Ignition
- Ignition and retry
B85/B120/B160
Heating
- Central heat call and post purge
B85/B120/B160
Domestic hot water
- Indirect tank call and priority
B85/B120/B160
Freeze protection
- Anti-frost pre-heat
B85/B120/B160
Other
- Anti-legionella cycle
B85/B120/B160
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.