Daikin · General · Other
Damper open and close sequence with ventilator
What happens, in order
- Ventilator starts and the receptacle is energized.
- Motorized damper opens automatically.
- Ventilator stops and the receptacle is de-energized.
- Motorized damper closes.
Applies to: DQ-P-MDV with DQ-P-16-100 Powered Ventilator
Models
DQ-P-MDVDQ-P-16-100
More Daikin general sequences
- Power-on and start-up · Startup
- Heater operation and fan run-on · Heating
- Optional heater accessory staging (DQ-P-70-AH-H) · Heating
- Humidifying filter drying after humidifying stops · Standby/shutdown
- Shutdown for prolonged non-use · Standby/shutdown
- Stopping operation · Standby/shutdown
- AUTO operation switching and monitoring mode · Other
- Energy Savings mode sampling cycle (out-of-limit intake air) · Other
Related
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Daikin IO-DPVMD motorized damper installation manual, p. 3. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.