Navien · Heat pump troubleshooting

Duct installation rules

NWP500

What is going on

Follow these rules so the ducting is safe, efficient and code compliant. Non-compliant systems are not supported.

Likely causes

  • Ducts connected to existing ductwork.
  • Recirculated cold air through the intake.
  • Ducting that is not HVAC or UL approved.

Check in this order

  1. Follow local building and HVAC codes.
  2. Do not connect the heater to existing ductwork.
  3. Use HVAC-approved and UL-approved ducts and terminations.
  4. Support ducts so they stay level or plumb.
  5. Keep rigid ducts away from floor joists. Use a short flexible section between the heater and rigid duct.
  6. Insulate ducts per code to prevent condensation.
  7. Route ducts as directly as possible and minimize elbows.
  8. Use the largest practical duct area and terminations.
  9. Place terminations so discharge air cannot be drawn back into the intake.
  10. Total duct length is the inlet plus outlet length.

Applies to: NWP500-50, NWP500-65, NWP500-80

More heat pump guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NWP500 installation manual, p. 27. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.