Rheem · Furnace troubleshooting

Post-conversion checklist

96V96MDV

What is going on

This is the walk-around before you close up a field conversion on a Rheem 96V or 96MDV. Most call-backs I see after conversions are a kinked hose or a drain that holds water, so go slow on these. Confirm each item against the printed page in the installation instructions.

Likely causes

  • Not a fault call. Final checklist after a field conversion.

Check in this order

  1. Review the conversion steps once more against the manual.
  2. Verify all hoses are secured and fully seated.
  3. Confirm all hoses are free of kinks.
  4. Confirm the condensate plumbing slopes in the direction of water flow.
  5. Confirm all drain ports are plugged.
  6. Confirm all clamps and couplings are tightened.
  7. Confirm the unit has forward pitch.
  8. Run it and watch for condensate leaks.

Applies to: All field conversions

More furnace guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: 96V series installation instructions, p. 16. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.