Rheem · Furnace troubleshooting

Install solid metal base pan for upflow side return

96V96MDV

What is going on

If you're setting up a Rheem 96V/96MDV upflow with a side air return, the solid metal base pan has to go in. Skip it and combustion products can get into the living space, which is a carbon monoxide risk, so don't leave it out. On a bottom return it's the opposite, you must not install the solid pan.

Likely causes

  • Not a fault call. Required part for side return upflow installs.

Check in this order

  1. Take the blower door off first.
  2. Insert the tab onto the flange and push the panel into place.
  3. Install the screw in the tab located in the blower compartment.
  4. Tape all edges of the bottom to cover gaps.
  5. After installing the bottom plate, seal all seams tight with metal tape.
  6. Double check it is a side return install. For bottom return, leave the solid pan out.

Applies to: Upflow furnaces with side air return

More furnace guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: 96V series installation instructions, p. 43. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.