Allied · Furnace troubleshooting

Install sidewall vent termination

A95/A93/95G1/92G1UH

What is going on

Field-supplied sidewall termination. Heights and spacing matter. Get them wrong and you get blocked pipes, recirculated flue gas, or frozen terminations in winter.

Likely causes

  • Termination too close to grade or snow level
  • Exhaust and intake ends too close together, recirculating flue gas
  • Exhaust extension past the wall too long
  • Unsupported run-up pipe sagging
  • Uninsulated pipe in cold space

Check in this order

  1. Route intake and exhaust so the termination is at least 12 in above grade or average snow level.
  2. Keep exhaust pipe straight out or up as shown. Size it per Table 6.
  3. Limit exhaust extension to 12 in for 2 in PVC or 20 in for 3 in PVC past the wall.
  4. Keep at least 8 in between exhaust and intake ends (6 in with termination elbow).
  5. Support run-up pipe every 24 in. Use two supports if extension is over 24 in.
  6. Insulate with 1/2 in Armaflex where piping passes through unconditioned space, if required.
  7. Seal the wall penetration and check for gaps around the pipes.
  8. After startup, look at the termination during a call for heat to confirm clean exhaust.

Applies to: Non-direct and direct vent sidewall terminations

More furnace guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Allied 92G1UH installation instructions manual, p. 32-34. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.