What is going on
Field-supplied sidewall termination. Heights and spacing matter. Get them wrong and you get blocked pipes, recirculated flue gas, or frozen terminations in winter.
Likely causes
- Termination too close to grade or snow level
- Exhaust and intake ends too close together, recirculating flue gas
- Exhaust extension past the wall too long
- Unsupported run-up pipe sagging
- Uninsulated pipe in cold space
Check in this order
- Route intake and exhaust so the termination is at least 12 in above grade or average snow level.
- Keep exhaust pipe straight out or up as shown. Size it per Table 6.
- Limit exhaust extension to 12 in for 2 in PVC or 20 in for 3 in PVC past the wall.
- Keep at least 8 in between exhaust and intake ends (6 in with termination elbow).
- Support run-up pipe every 24 in. Use two supports if extension is over 24 in.
- Insulate with 1/2 in Armaflex where piping passes through unconditioned space, if required.
- Seal the wall penetration and check for gaps around the pipes.
- After startup, look at the termination during a call for heat to confirm clean exhaust.
Applies to: Non-direct and direct vent sidewall terminations
More furnace guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Allied 92G1UH installation instructions manual, p. 32-34. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.