Gas piping installation
What is going on
Gas piping to the furnace is simple once you know the rules. Upflow units ship set up for left-side gas piping, and there is a right-side knockout if the gas comes in from the other side. What matters is sizing the pipe for the load, putting in a shutoff and union so the furnace can be serviced, and a drip leg to catch dirt and moisture before it reaches the gas valve. Always leak-test with soap solution, never a flame.
Likely causes
- Undersized pipe starving the furnace at full fire
- No drip leg letting debris reach the gas valve
- Gas valve damaged by wrenching without a backup
- Wrong pipe compound on propane
- Leaking joints from poor assembly
Check in this order
- Size piping using the pipe capacity table for the required cfh and run length.
- Install a ground joint union and a manual shut-off valve ahead of the furnace.
- Install a condensation drip leg ahead of the controls as required by national codes.
- Use a backup wrench on the gas valve when connecting piping to prevent damage.
- Use pipe joint compound that resists liquefied petroleum gases.
- Check all gas joints for leaks with soap solution. Never use an open flame.
- Have a licensed gas fitter do the work and do a final leak check with the furnace firing.
Applies to: Gas supply connection
More furnace guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Trane 18-CD29D1-11 installer's guide, p. 35. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.